a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

If the volume of a cone is 168 pi inches and its altitude is 14 inches, what is the radius of the cone? A. 36 inches B. 12 inches C. 72 inches D. 6 inches
(The kite runner) What does Amir mean when he says he's considered a tourist in his own country?
How many moles of oxygen are needed to combine with 87 g of lithium according to the given equation: 4 Li + O2 --> 2 Li2O
Turbines, or mills, are used to produce alternative energy and are powered by ________.
what is the difference between the period and amplitude of a pendulum?
Which statements best reflect the difference between a memoir and a biography?
What is 92 times 3 plus 82
fill in the blanks with ce/cette/cet/ces
1. What are two advantages of two disadvantages of hydropower?
Graph the line with slope 1 passing through the point (4, 2).