When using a software budget, you should feel very confident if you choose a solution that looks like it will come in exactly on budget, without any overage costs.

a
True

b
False

Respuesta :

PrestonHedlund
PrestonHedlund PrestonHedlund
  • 02-01-2021

Answer:

probably false

Explanation:

because u dont want a budget to b exact u want it completely covered

Answer Link

Otras preguntas

It takes April 7 1/3 hours to drive to her grandparents' house. So far she has driven 3 5/6 hours. How many more hours does April need to drive?
The total energy of all the particles in a substance is called a. temperature. b. thermal energy. c. degrees. d. mass.
In "The (Untrue) Story of John smith and Pocahontas," how is the authors point of view different from the point of view of someone who believes the legend of Po
who will win the election for President 2016
Maggie has 20 ribbons. 2/5 of the ribbons are polka-dotted ribbons. How many ribbons are not polka - dotted?
Which Romantic writer bested others in a ghost story challenge?
A specific factor having a range of possible values is a __________. a. variable b. mean c. median d. mode
Why were tyrants able to hold power in various Greek city-states?
75% of what is 15 I cant figure this out iv tried a million times
Which professions best characterize the jobs held by people in the middle class at the turn of the twentieth century?