razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

is a sheet of paper is cut in half is this physical change or chemical change
who is the person who started a newspaper called the north star
Analyze how friction can be both a positive and negative aspect In our every day lives
Which occurs during translation? A.mRNA is created by using a DNA template. B.mRNA codons are joined by tRNA anticodons to assemble amino acids to form a protei
0.8x+3.2-4.3x=7.7-1.2x
Which French leader of the Protestant Reformation made Geneva a center of Protestant thought and faith? A. John Calvin B. Teresa of Avila C. John Huss D. Martin
7 2\3+ (5 1\6-1 5\9)
3/8 divided by 1/2 =
How does meiosis I differ from meiosis II
determine wheter 3x+12+x is equivalent to 4(3+x). use properties of operations to justify your answer. please help! answer only if you know!