jocelynmullens
jocelynmullens jocelynmullens
  • 04-05-2021
  • Computers and Technology
contestada

HURRY please!!!!

Order the steps for creating a chart in PowerPoint.
Go to the Insert tab.
Choose the type of chart.
Click OK
Click the Chart button.

HURRY please Order the steps for creating a chart in PowerPoint Go to the Insert tab Choose the type of chart Click OK Click the Chart button class=

Respuesta :

jellooo26 jellooo26
  • 04-05-2021
1. Go to insert tab
2. Click the chart tab
3. Choose the type of chart
4. Click OK
Answer Link
calliemoris0017
calliemoris0017 calliemoris0017
  • 10-05-2022

Answer:

the person above is correct

Explanation:

edge

Ver imagen calliemoris0017
Answer Link

Otras preguntas

Substitute the given values into the formula and solve for the unknown variable. If necessary, round to one decimal place S= 4LW+2WH; S=180, L=7, W=5 (Surface
Round 6.007 to the nearest hundredth
Mr moore has saved the liscense plates from all his cars. He has nailed them to a wall in his garage. The wall is 5 meters long and 3 meters high. How any licse
Please answer this correctly
Find five consecutive integers such that: “The sum of the first and 3 times the fourth is equal to 39 less than twice the sum of the second, third, and fifth.”
if log 55 = 1.74 , what is the value of log1000 55 ?
Applications of quadratic equations Find two conservative odd integers such that the sum of their squares is 514
What is the coefficient of the c-term of the algebraic expression Options: -34 -1 0 1
The quotient of r and 19
Why did the settlers to Jamestown as the site for their colony