MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

What is the y-intercept of the line with slope -2 that passes through (3, 1)?
Which of the following would eliminate the variable on the left side of the given equation? 38 - 15w = 25w + 4
I don't know how to solve any of these probability questions.
Two force A and B at a point at right angles. If their resultant is 50N and their sum is 70N, find their magnitudes.
How did the Industrial Revolution affect the lives of the working class? Choose three correct answers. More people lived in large cities. More people worked in
help me to answer the questions
A theorem in geometry states that the measure of an inscribed angle.
Need help with a and b.
Which of the following sentence fragments needs a verb to make it a complete sentence?
If the legends of King Arthur were indeed based on a real person, how would this person differ from the character depicted in literature?