hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

If a newspaper costs $0.60 and you only have $5.00 in quarters, how many cents would you lose out on because the vending machine doesn't give back any change?
show that (3*8*x)^7= 6^7*8^7*x^7
A presentation about cycling as a sport.
Glaucoma is a disease of the eye that is manifested by high intraocular pressure. The distribution of intraocular pressure in the general population is approxim
graphs of what functions? HELP PLSS
The results of a survey of 200 adults are shown in the table?
I need HELP asp please!!!!!!!
what is the cube root of 27/64?​
(f) How does stomach help in digestion?in brief​
Why is 90% of logging activity in Canada considered “unsustainable”?