hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

The coefficients in a balanced chemical equation represent (l ) the mass ratios of the substances in the reaction (2) the mole ratios of the substances in the r
What was one important thing that Abraham Lincoln did?
help on questions 11 and 15 Add and simplify if possible
Name one war fought by the United States in the 1900s.
Name one U.S. territory
Given the balanced ionic equation: 3Pb2+ + 2Cr ==> 3Pb + 2Cr3+ What is the number of moles of electrons gained by 3.0 moles of lead ions? (1) 5.0 mol (3)
How/why do copy machines produce o zone?
Who is the Commander in Chief of the military?
What is the approximate height of the average adult in centimeters?
Given the balanced equation representing a reaction: Al2(SO4)3 +6NaOH ==> 2Al(OH)3 + 3Na2SO4 The mole ratio of NaOH to Al(OH)3 is (1) 1:1 (2) 3:1 (3) 1:3 (