agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

NO LINKS!!!!! Use the scale drawing to determine how wide the duck pond is? A. 9 feet B. 18 feet C. 27 feet D. 36 feet
Please answer fast: If two equations are graphed, how can you find the solution to the system of equations? A) Find the slope of point lines. B) Find where the
How many points does a team get if they score a Touchdown?
Help me find the Slope of the line, the x-intercept of the line , and the y-intercept of the line
have you ever fallen down the stairs
What points should you remember throughout your job search process? Select an answer: A). Resumes are subjective and will get you a job interview, not the job.
the graph of a linear function is shown on the grid. which equation is best represented by this graph?A) y + 2 = 7/5(x + 7)B) y - 3 = 7/5 (x - 7)C) y + 2 = 5/7(
Can someone tell me the answer to this please???
what type of element are Fe, Co, Ni?​
Convert the hexadecimal numeral to Hindu-Arabic 4A9EDsixteen 8