RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

Is this a good thesis statement for my essay? The Earth has many life-threatening problems caused by humans. One of these problems is the over-consumption of w
the ratio of boys to girls at the movie is 4:7. If there are 21 girls, how many boys are at the movie?
9 to the x-5 power=27
What is one half added to three tenths
What is party-as-organization?
what forces led Americans to declare war on Britain in 1812?
The area of a square field is 200 square feet. What is the approximate length of each side of the field? Round your answer to the nearest foot.
describe why the bureaucratic personality can be dangerous.
One of the heaviest rainfalls recorded in Greentown in a 24 hour period was 178.8 centimeters. If the rainfall was constant how many centimeters of rain fell du
Log4(6x-8)=3 Help please